Bathroom Remodeling in Utah: Beautiful Results, No Surprises

Modern bathroom with a glass-enclosed shower, a bathtub by a window, and a double sink vanity with mirrors and wall sconces.

Bathroom Remodeling Done Right

Your bathroom should feel like a retreat, not a renovation you've been putting off for years. Terra Kitchen & Bath handles full bathroom remodels across the Salt Lake Valley, from a simple tile refresh to a complete master bath overhaul.

We design it, build it, and finish it. And we do it on time, with transparent pricing and a crew that communicates throughout the entire process.

What We Do

Walk-In Showers & Tile Work

Custom tile layouts, frameless glass enclosures, built-in niches. We build showers that look exactly like the ones you've been saving on Pinterest. Waterproof throughout, installed to last.

Full Bathroom Renovations

If your bathroom needs a complete reset, we'll take it from demo to done. New layout, new fixtures, new tile, new everything. One team, one clear timeline.

Vanity & Storage

Double vanities, floating vanities, custom storage. We help you find the right fit for your space, your style, and your family's daily routine.

Lighting & Ventilation

Good bathroom lighting makes a bigger difference than most people realize. We upgrade fixtures and ventilation as part of the project, not as an afterthought.

Accessibility Upgrades

Walk-in showers, grab bars, no-threshold entries, comfort-height fixtures. We design and install accessible bathrooms that work for every stage of life.

How Much Does a Bathroom Remodel Cost in Utah?

Bathroom remodel costs in Utah depend on bathroom size, fixture selections, and how much of the layout changes.

$8,000 - $15,000

Basic update (new fixtures, tile refresh, vanity)

$15,000 - $28,000

Mid-range remodel (new shower, flooring, vanity, lighting)

$28,000 - $50,000+

Full master bath renovation (layout changes, custom tile, premium fixtures)

We give you a detailed quote upfront. No surprises on the bill.

Frequently Asked Questions

How long does a bathroom remodel take?

Most bathroom remodels take 1 to 3 weeks. A full master bath renovation with layout changes may take 3 to 5 weeks. We set your timeline before work begins and we keep it.

Do I need a permit for a bathroom remodel in Utah?

Plumbing and electrical work typically require permits. If you're just replacing tile, fixtures, or a vanity without moving pipes or wires, permits usually aren't required. We'll let you know exactly what applies to your project.

Can you match my existing tile?

We'll do our best. If your existing tile is discontinued, we can help you find a close match or use the opportunity to upgrade the surrounding tile as part of the design.

Do you do accessible bathroom remodels?

Yes. We design and build accessible bathrooms for aging-in-place, mobility support, or multi-generational households. We can walk you through the options during your consultation.

Ready to Finally Redo That Bathroom?

Get in touch for a free consultation. We serve Salt Lake City, West Jordan, Sandy, Draper, South Jordan, Midvale, and the surrounding area.